Love seeing this truck, means my inspector is on site! |
Today we had our Rough Framing, Electrical and HVAC inspections. The inspector is getting to be quite the buddy of mine, whether we like it or not. I was a bit worried about the framing and HVAC, but certainly didn't think not having the wire pulls fully complete would be the thing to fail the inspection! Wires can be seen after the walls are on, so I'm not quite sure I get it. In the end, he said we could still proceed with the insulation and just have him come back out in 2 days when the wire pulls would be done. So technically, not a fail. But not a pass either.
For the record, he did leave me one of those dreaded correction tickets. He said it was proof to his boss that he wasn't just on a long lunch break.
No comments:
Post a Comment