We will have doors, baseboard, window casing and of course, many rooms, that all need painting.
This is a huge step towards moving us closer to the finish line. With paint done we can lay the floors, do the casework and call back the trades to do their trim out.
We have a goal of moving in by Christmas! Help us make dreams become reality!
![]() |
Interior door |
![]() |
Trim & Base |
Taped and ready to paint |
On a separate note, since our washer and dryer in our current home were still fairly new, we decided that they should come with us to the new house. But we really didn't want to sell the old house with them in there and have to tell people they weren't included. And we also didn't want to live without a washer and dryer for the next month or so. Enter the substitutions.
In other progress, the guys dug the trench and laid the secondary gas line, from the house to the outbuilding. They also installed the insulation on the outside of the outbuilding, which was needed for the radiant heat flooring system.
No comments:
Post a Comment